Phone: +1 (214) 421-7366 Fax: +1 (214) 565-0976
AT-10, AT-30, AT-10BT, AT-5, AT-200SPECIFICATIONSPLEASE READ PAGE 2 - "GENERAL INFORMATION," BEFORE YOU CONTINUE.Electrical Information - Mo
Electrical information - AT-200Each toaster is equipped with a 4 foot (122 cm), 3 wire grounded power supply cord which terminates with a 3 prong plug
12C. INSTALLATION1. Place the toaster on a flat surface and in such a way that the unit's vents are not blocked. Air must circulate under and th
13OPERATING INSTRUCTIONSA. PREPARATlON/WARM-UP:1. Main Power: Turn toaster on by pressing the Main Power switch up. Turn the toaster off by pressing
14 SPECIFICATIONSPLEASE READ PAGE 2 - "GENERAL INFORMATION," BEFORE YOU CONTINUE.Electrical Information - Models BT-15 .Each uni
15B. ASSEMBLY1. Lay the toast on its side and install four adjustable legs into threaded holes in base. Tighten legs with crescent wrench. The un
b) Temperature: TOP HEAT - The MIN. setting will help produce the lightest top-toast. The MAX. Setting will help produce the lightest toa
IMPORTANT FOR FUTURE REFERENCE Please complete this information and retain this manual for the life of the equipment. For Warranty Service and/or
Notes:18
19 APW WYOTT EQUIPMENT LIMITED WARRANTYAPW Wyott Foodservice Equipment Company warrants it's equipment against defects in materials and workmansh
TABLE OF CONTENTSGENERAL INFORMATION AND TROUBLESHOOTING 2M SERIES - DIAGONAL CONTACT CONVEYOR TOASTERS 3-9Electrical Specifications 3Installation 3
20APW WYOTT729 Third AvenueDallas, TX 75226Phone: +1 (214) 421-7366 Fax:
Model Stock Dimensions* Electrical Productivity WeightNumber Number Halves/Hour Net/Ship83501 120V-1600W-13.3A Up to 1600M-83 83502 20"H x 24 5/8
42. ASSEMBLY (REFER TO ILLUSTRATIONS ABOVE)a) Lay the toaster on its side and install the four Adjustable Legs (Item 1) in threaded holes in base. T
c) Remove Top Front Panel (Item 4A) by gripping rear edge and lifting up. The Bottom Front Panel (Item 4B) can then be removed by h
6LOCATION.1. Place the toaster on a flat surface and in such a way that the unit's vents are not blocked. Air must circulate under and through t
7C. PRODUCTIONTo Grill Buns - the following is the basic procedure to operate the bun toaster.Fig. 1. Heat toaster oil to melting point and fill the b
8M-91: Push Butter Roller shaft to the right to disengage the notched end of the shaft from the drive motor and remove. To facilitate cleaning, the sh
9a. Set Thermostat at 4000 or number 8 and allow a full 20 minutes for warm-up.b. Coconut oil is the recommended oil. Use of other oils will prove t
Comments to this Manuals